The project required significant site preparation and specialist engineering solutions within one of the UK's most strategically important military bases.
The project commenced with extensive site clearance works, including vegetation removal,demolition of an existing toilet block and the removal of redundant site structures. Following these enabling works, McCoys undertook the civils and infrastructure package required to facilitate the construction of the new hangars and workshop buildings.
A key challenge was the site's historic use, with the development area located on land that had previously formed part of an infilled pond. Significant groundwater issues had to be overcome before construction could safely proceed.Working alongside specialist dewatering contractors, McCoys helped implement an innovative solution involving the construction of a slurry wall around the perimeter of the site, enabling groundwater to be effectively controlled and creating a suitable platform for development.
The project also required the highest levels of security and coordination due to RAFFairford's operational status and its use by United States Air Force personnel.Through careful planning, strong stakeholder engagement and specialist engineering expertise, McCoy successfully delivered the enabling and infrastructure works package, laying the foundation for the successful completion of the new military aviation facilities.
The successful delivery of the enabling and infrastructure package demonstrated McCoy's ability to overcome technically demanding site conditions through innovative engineering solutions. The implementation of specialist ground water control measures, including the construction of a perimeter slurry wall and comprehensive dewatering strategy, transformed a challenging site into a viable development platform.