CASE STUDY

Whittington Barracks

Project:
Whittington Barracks Medical Centre Development
Location:
Lichfield
Value:
£5million
Sector:
Defence
Services:
Civil Engineering
Earthworks
Groundworks

 McCoy Contractors was appointed by Kier Construction to deliver the groundworks, infrastructure and external works package associated with the development of anew modular medical centre at Whittington Barracks. The scheme was designed toprovide modern healthcare facilities for personnel based at the militaryinstallation while improving supporting infrastructure across the site.

the Project.

The project involved preparing the site for the modular building installation through the delivery of foundations, below-ground drainage systems and associated service infrastructure. In addition, McCoys constructed a new Sustainable Drainage System (SuDS) designed to effectively manage surface water runoff while supporting the site's long-term environmental objectives. The package also included the creation of a new car park and associated external works to ensure safe and efficient access to the facility.

Working within an operational military environment required close coordination with barracks personnel and adherence to strict security procedures throughout the duration of the project. The integration of drainage, parking and healthcare infrastructure demanded a collaborative approach and meticulous programme management to ensure the various project elements progressed seamlessly.

The completion of the infrastructure package has helped facilitate the creation of a modern healthcare facility that will serve military personnel for many years to come.

 

‍

McCoy Contractors delivered:

WANT TO SEE MORE?